Skip to main content
Self - Hosted Updates: August 12th, 2026
Image Version: 1.2.32
Plugin Version: 0.16.65
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Default Aggregation for Users: Admins can now configure a default aggregation for measures at the Datamart level, and the aggregate will be added by default for measures for end users. (Image 1)
  2. Default Sorting for Users: Admins can now configure default metric sorting, allowing end users to view metrics sorted by measure in ascending or descending order. (Image 1)
  1. Mandatory Admin-created Filters with Custom Alias Support: End users can rename dashboard or metric filters configured by the Admin.
  2. Sort Options in Dashboard and Metric Filters: End users can use ASC/DESC sort options in dashboard and metric filters configured by the Admin. Admins can enable this using the Allow Sorting toggle. (Image 2, 3)
  1. Metric Filters for End Users: End users can now add metric filters. The below guest token request body enables end-user metric filter creation:
The metricFilterColumns setting ensures end users can create filters only on admin approved columns.

Enhancements:

  1. Single Value Card Underlying Data Enhancement: Added a toggle in the UI Theming page to show complete underlying data in fullscreen mode. (Image 4)
  1. Drill Down Enhancements: Drill Down now retains chart settings such as renamed column aliases, measure aggregations, filters, sort order, joins, group by, calculated fields, and LIMIT clauses.
  2. Pagination Enhancement in Full Screen Mode: Added the ability to control pagination for underlying data in full screen mode. (Image 4)
  1. Conditional Formatting Improvements: Improved the conditional formatting workflow for table charts and Pivot Table Chart V3, making it easier to apply formatting rules to table columns. (Image 5)
  1. Log Scale Support for Horizontal Bar Charts: Added a Log Scale (Base 10) toggle for horizontal bar charts, similar to the existing vertical bar chart option. (Image 6)
  1. Pivot Table Enhancements: Added UI Styling section for Pivot Table Chart V1 and V2.
  2. Number Formatting Enhancement: Increased the maximum supported limit for digits before the decimal point using custom SQL query.
  3. Dashboard Scroll Minimap Prop: The dashboard scroll minimap is now disabled by default. It can be enabled using the prop: enableDashboardMinimap: true

Fixes:

  1. Enhanced Mobile View: Improved filter indication for applied and saved filters, and added a clear filter option for date filters.
  2. Bar Chart Underlying Data: Resolved an issue where underlying data showed “No data found” when group by was enabled in bar charts.
  3. Trino Compatibility: Implemented support for MEDIAN or PERCENTILE_CONT functions compatible with Trino syntax in the DataBrain UI.
  4. Datamart Update API: Resolved an issue where the update API failed due to invalid GraphQL while syncing the linked access tableList JSONB field.
  5. MSSQL/Fabric Query Fix: Fixed an issue where SELECT DISTINCT metric queries failed because of a synthetic pagination ORDER BY clause.
Image Version: 1.2.31
Plugin Version: 0.16.61
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Dashboard Filters in Scheduled Reports:
    Added support for selecting dashboard filters and their values when configuring Scheduled Reports.

Enhancements:

  1. Pivot Table V3 Enhancements:
    Added support for hiding measure columns, choosing whether dimensions appear as hierarchical row levels or regular columns, renaming and reordering custom calculated measures, and displaying comma-separated distinct values at higher hierarchical levels.
  1. Dashboard Scroll Minimap:
    Dense dashboards now show a compact overview of all metrics, your current position, and your progress through the dashboard. Click a metric in the minimap to jump directly to it, including metrics that have not rendered yet.
  1. Single Value Card Null Display:
    When a column returns no value in a Single Value Card, users can now display either a blank space or -.

Fixes:

  1. Chart Resolution and UI:
    Improved ECharts resolution in the app, plugin, PDF downloads, and Scheduled Reports. Also fixed dropdown text wrapping issues.
  2. Data and SQL:
    Fixed Trino custom measure SQL errors and underlying data issues where chart-point filters were not applied correctly.
  3. Plugin and Self-Hosted Deployments:
    Fixed duplicate PDF downloads in self-hosted deployments, refactored the Save Layout and Reports flows in the plugin, and resolved token variable errors in Powerful LLM.
Image Version: 1.2.28
Plugin Version: 0.16.56
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Microsoft Fabric Data Source:
    Added support for Microsoft Fabric as a new data source.
  1. Multi-Dimension Support for End Users:
    End users can now create metrics using multiple dimensions.
  1. Dashboard Filters for End Users:
    End users can now create dashboard filters from client-specified columns. The following guest token request body enables end-user dashboard filter creation:
The dashboardFilterColumns setting ensures end users can create filters only on approved columns.

Enhancements:

  1. Single Value Card Enhancement:
    Added support for comparison values in the Single Value Card, along with a Show Aggregated Value toggle to display the aggregated value instead of the current period value.
  1. Date Filter Dependency Support:
    Dashboard Filters (Auto & Custom), Metric Filters (Auto & Custom), and Dynamic Properties can now depend on Date Filters.
  1. Metric Card Appearance Controls:
    Added options to show or hide the card stroke and hover shadow for individual metric cards. These settings are available in the Save to Dashboard dialog.
  1. Wrap Text Support for Y-Axis Labels:
    Added a Wrap Text toggle under Axis Label Setup for vertical charts. Long category labels are now wrapped into an aligned column for improved readability.

Fixes:

  1. Dashboard Export/Import:
    Fixed an issue where Metric IDs referenced in Metric Expressions were not updated after importing a dashboard, resulting in connection errors.
  2. Schema Caching:
    Improved schema caching performance for data sources containing 500+ databases.
  3. Chart Legend Colors:
    Fixed an issue where legend colors were not applied correctly when the dimension column was of INT data type.
  4. Table Chart Number Formatting:
    Fixed an issue where number formatting was not applied to the value 0 in Table Charts.
Regards,
The DataBrain Team.
Image Version: 1.2.25
Plugin Version: 0.16.55
DataBrain Updates: Enhancements, Fixes

Enhancements:

  1. GBP Formatting Option:
    Users can now format numeric values in GBP for supported chart types.
  1. PDF Export Date Formatting:
    Users can now customize the date format used in exported PDFs.
  1. Line Breaks in Table Chart:
    We have added Allow Line Breaks under Chart Settings > UI Styling > Enable Content Text Wrap. When enabled, newline characters from raw data are preserved.
  1. Conditional Formatting for Formatted Values:
    We have added an option to compare conditional formatting rules against either Raw Data or Formatted Data. The Formatted Data option is available only when number formatting is applied to the selected column.
  1. Dashboard Range Filter Enhancement:
    Dashboard range filters now support cases where only a minimum or maximum value is provided.
  1. Adding Tenancy Column to Datasource Page:
    Added a Tenancy column on the Datasource page to display each datasource’s tenancy as a badge.

Fixes:

  1. Pivot Table V3 Downloads:
    Fixed an issue where Pivot Table V3 downloads did not include calculated measures from Pivot Settings.
  2. Athena Dashboard Metric Download:
    Fixed an issue in the Athena dashboard metric download flow when a row limit was applied.
  3. Datamart Table Selection:
    Fixed an issue in Datamart table selection where Select All Tables selected all datamart tables instead of only the filtered search results.
Regards,
The DataBrain Team.
Image Version: 1.2.24
Plugin Version: 0.16.51
DataBrain Updates: Enhancements, Fixes 📢

Enhancements:

  1. Tooltip Dotted Data Point Line:
    We have implemented the ability to manage dotted data point lines in chart settings.
  1. Styling the Tooltip Container:
    We have added a prop to style the tooltip card, including padding, border radius, background color, and border color.
  2. Hide the Adjust Spacing Feature in Customize Layout:
    We have included a prop to hide the Adjust Spacing feature in the Customize Layout section.
  3. Display All Chart Settings:
    We have added a prop that bypasses the default chart settings and displays all possible settings, unless otherwise configured through custom-chart-settings.
  4. Customize Available Chart Types in End User Create Metric:
    We have added a prop that allows users to customize the available chart types in the End User Create Metric feature.
  5. Export As PDF Server Events:
    We have added server events to monitor the initiation and completion of the Export As PDF operation.
  6. Client Dropdown Visibility for Editor Users:
    Added a View Clients permission under the Dashboard section in Roles. This permission controls the visibility of the client dropdown in multi-tenancy scenarios on Dashboard and Create Metric pages.
  7. Hide Enabled Columns for Respective Roles in Datamart:
    Columns can now be hidden for specific roles when the Hide To function is enabled.

Fixes:

  1. Update Dashboard API Error Message:
    The API now returns a proper error message instead of a 500 error for an invalid workspaceName.
  2. Pivot V3 Calculated Columns:
    We have resolved an issue where exponent-type numeric data, such as 1.91618e-11, was treated as -.
  3. Range Filter:
    Fixed an issue where underlying data was not filtered correctly when a range filter was applied.
Regards,
The DataBrain Team.
Image Version: 1.2.18
Plugin Version: 0.16.43
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Update Dashboard Filter in Update Dashboard API:
    Support has been added for updating dashboard filters via the Create Dashboard Embed API.
  2. Global Search Feature:
    Users can now search for any workspace, dashboard, or metric within their account.

Enhancements:

  1. Dashboard Element Font Color in UI Theming Page:
    Added support for customizing dashboard element font colors within the UI theming page.
  1. Dashboard Component Customization:
    Introduced new props for:

Fixes:

  1. Scheduling & Formatting
    • Added support for scheduling reports in minutes.
    • Resolved issues with duration-based conditional formatting.
  2. Pivot Table Improvements (V2 & V3)
    • Fixed rendering issues when using multiple dimensions.
    • Corrected incorrect (0) values appearing in numerical dimensions.
  3. Dashboard UI & Layout Fixes
    • Fixed overlapping axis labels in horizontal bar charts (specifically for embeds).
    • Resolved alignment issues in single value cards.
    • Fixed an issue where font sizes would randomly reduce.
    • Removed left padding in top-level filters.
  4. Dropdown & Data Sync Issues
    • Fixed the client dropdown not reflecting updated primary key changes.
    • Resolved missing dropdown options in the dashboard view.
  5. SQL Editor:
    Fixed an issue where comments were being removed during execution due to auto-formatting.
  6. Authentication & Data Integrity
    • Fixed expired guest token issues occurring in scheduled email reports.
    • Resolved duplicate column issues during MSSQL metric creation.
  7. Datamart & Metric Consistency:
    Fixed an issue where deleted datamart columns continued to appear in the network tab, which caused custom columns to show connection errors and invalid metrics to expose the fullscreen action.
Image Version: 1.2.16
Plugin Version: 0.16.38
DataBrain Updates: Features, Enhancements, Fixes 📢

Features:

  1. Alerts:
    We have introduced a new feature, Alerts, which notifies users when there is an error in the data source connection or when a datamart is broken, making the dashboard unviewable.

Enhancements:

  1. Color Selection from Colors Tab:
    Users can now drag and reorder colors directly from the Colors tab.
  1. Context Window Indicator in AI Copilot:
    Displays token usage per session (input and output). The limit varies by LLM and determines how much conversation can be retained. Once reached, the chat cannot continue.
  1. Delete Datamart API:
    Added validation and improved error messaging to prevent the deletion of datamarts that are connected to a workspace.

Fixes:

  1. Pivot Table V3:
    Fixed an issue where conditional formatting was not rendering when a suffix was applied.
  2. Horizontal Bar Chart:
    Added support for the Group By functionality.
  3. Elasticsearch:
    Fixed issues related to schema sync and index handling.
  4. Cdb:
    Fixed an issue with the stable build for fresh installations using a new database.
Image Version: 1.2.13
Plugin Version: 0.16.35
DataBrain Updates: Features, Enhancements, Fixes 📢

Features:

  1. Multiple Datamart Connection Support:
    Introduced multi-datamart support, allowing users to select and manage multiple datamarts.
  2. CRUD API Support for Semantic Layer:
    Users can now create, rename and update, and delete the Semantic Layer via APIs.
  3. Delete Workspace API:
    Introduced a new DELETE endpoint to enable workspace deletion via API.

Enhancements:

  1. Pivot Table Chart V3 Calculated Fields:
    Added support for custom calculated measures, allowing users to create and edit calculated columns.
  1. Add Conditional Formatting Support to Pivot Table V3:
    Introduced conditional styling with dynamic badge colors and background styles.
  1. Refinement of List Datamarts API: We have introduced an expandDetails option to the Datamart List API, enabling users to control the inclusion of detailed properties in responses.

Fixes:

  1. Pagination Sync Issue in Table Charts:
    Fixed an issue where the default row size option was not in sync with the pagination value for server-side pagination-enabled table charts.
  2. Plugin Manage Metrics: Messaging & Settings Access:
    When all metrics are hidden, an appropriate message will now be displayed. The settings/manage metrics button remains accessible even when all metrics are hidden.
  3. Addition of Server Events in Embed:
    Added server-side event tracking for key user actions, including metric creation/editing, data exploration (search, table selection, drag-and-drop, aggregation), chart changes, dashboard interactions (filters, manage metrics, layout), and exports/downloads.
  4. Retaining Primary Database Selection in Update Datamart:
    Ensured that the primary database selection is preserved during the Update Datamart operation.
Image Version: 1.2.11
Plugin Version: 0.16.34
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Chart Appearance and Chart Actions Props for End Users:
    We have added properties to the dbn-dashboard component that set default values for certain chart settings when a user creates a metric. Additionally, we have introduced properties for each of these settings that can lock the values, making them non-configurable for end users.
  2. Wildcard Support for OpenSearch:
    We have introduced wildcard syntax support for datamart tables, allowing users to specify flexible patterns when creating or updating tables.
  3. Workspace LLM Configuration via API:
    We have introduced optional LLM integration in workspace creation and update processes, allowing users to specify an LLM by name.
  4. User-Defined Click Action on Charts:
    We have introduced a chartClickFunction prop to enable custom click actions on charts. The Pass Complete Data to Function option allows you to pass the entire row data to the function, enabling dynamic customization of the panel content through the prop.

Enhancements:

  1. Admin users can now delete data apps and embeds directly from the UI.
  1. Median as an Aggregate Function:
    We have introduced support for the MEDIAN aggregate function for measures. Users can now use MEDIAN for numeric column aggregation, enhancing data analysis capabilities.
  1. Newly created or added embeds now appear at the top of the list under Data Apps.
  2. Extended timezone functionality to dashboard and metric filters for ClickHouse, Trino, Redshift, CockroachDB, PostgreSQL, and MSSQL data sources.
  3. End User Chart Click Function Enhancement:
    Added support to send the entire clicked row data instead of just a specific value:
    • When all data is passed:
      • For Table and Single Val: { columnName: value, } e.g. {"product name": "Product A1", "price": 4.444}
      • For Tree Map and Sankey: { name: xVal, value: yVal }
      • For others: { name: xVal, value: yVal, columnName: colName }
  4. Added support to import data files in the dashboard embedding API.
  5. Adding Flag in Connection Form for MSSQL Read Replica:
    We have introduced a readOnlyIntent checkbox option in the MSSQL integration configuration, allowing users to connect as a read replica for read-only operations.

Fixes:

  1. Fixed datetime issues in Trino.
  2. Fixed an issue with chart reset in in-app and plugin views:
    When updating already applied popup filters, charts in the dashboard were resetting before clicking Apply.
  3. Fixed issues with using the percentile function for measures in embeds.
  4. Fixed connection errors with metrics that include custom SQL queries or calculated fields.
  5. Fixed an issue with the OpenSearch alias for end-user metric creation.
Image Version: 1.2.10
Plugin Version: 0.16.33
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Create Empty Dashboard Embed API:
    We have introduced a prop that allows users to pass data from the Export API response when creating an empty dashboard embed.
  2. Export Embedded Dashboard API:
    We have introduced an endpoint to export embed data, enhancing data retrieval capabilities for users.

Enhancements:

  1. Description and Details for Embeds:
    We have added Description and Details fields for embeds.

Fixes:

  1. We have optimized the bundle size of the plugin.
Image Version: 1.2.9
Plugin Version: 0.16.32
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Cast or Convert Datetime Columns Based on Guest Token Timezone:
    Introduced timezone application functionality for datamart and end-user metric creation. Users can now toggle timezone adjustments for date-time columns via a new switch component in Datamart.
  1. CRUD on CockroachDB Datasource with API:
    Added API support to create, read, update, and delete CockroachDB datasource configurations programmatically.
  2. Readiness Endpoints for Self-Hosted Deployments:
    Introduced health check endpoints to monitor application status.

Enhancements:

  1. SSH Tunneling Support for Redis:
    Introduced SSH tunneling support for Redis connections, enhancing configuration options when creating company Redis instances.
  1. Dynamic Adjustment of Axis Limits in Charts:
    Users can now dynamically adjust the lower and upper limits of the vertical axis in all charts with axes.
  1. Chart Actions Enhancement for Table Chart:
    Added row redirection and column redirection options for table charts.
  1. Enhancement of Import Dashboard API:
    Introduced dashboardId and dashboardName as parameters in the API.
  2. Support for Reflecting Embed Name While Creating an Empty Dashboard Embed:
    Added an optional isRenameDashboard parameter to the dashboard creation functions, allowing users to conditionally rename dashboards during the creation process.

Fixes:

  1. Export as PDF Download Speed:
    Improved performance for exporting dashboards as PDF.
  2. Alias Mismatch After Editing Metrics in Imported Dashboards:
    Resolved an issue where aliases did not match properly when users edited metrics by adding filters or sorting.
  3. Export Dashboard API Error Handling:
    Enhanced error handling by introducing a specific error message for invalid dashboard IDs or workspace names, improving API response clarity.
  4. Boolean Dashboard Filter in Postgres:
    Fixed issues with boolean filters in Postgres-backed dashboards.
  5. OpenSearch Connection Issue:
    Fixed a connection issue affecting OpenSearch.
Image Version: 1.2.8
Plugin Version: 0.16.31
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. API to Whitelist Domains:
    We have introduced a new API endpoint whitelist-domains to manage whitelisted domains associated with a company.
  2. API for SMTP Settings:
    We have introduced a new API endpoint smtp-settings to save and update company SMTP settings, improving email configuration management.

Enhancements:

  1. Rotate Data App API using Self Auth:
    Updated the authentication method for Data App API key rotation from the master token to the current API key.
  2. Customization of “Exporting Dashboard” Prompt Position:
    Added a property in the dashboard component to customize the position of the Exporting Dashboard prompt:
    exportMsgPosition: "bottom" | "bottom-left" | "bottom-right" | "center" | "top" | "top-left" | "top-right".

Fixes:

  1. Cockroach DB:
    Resolved SSL certificate verification and date filter issues.
  2. BigQuery:
    Fixed an issue with underlying data in the time-series chart.
  3. OpenSearch:
    Fixed a connection issue.
  4. Datamart:
    Added unique name constraints in app and APIs.
  5. Data App API Keys:
    Updated to accept expiryTime as a string instead of a number.
Image Version: 1.2.7
Plugin Version: 0.16.30
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Create & Rotate Service Token API:
    We have introduced service token management with two new endpoints for creating and rotating service tokens. Validation schemas have also been added for service token operations to ensure data integrity.
  2. New Data Source - Cockroach DB:
    Support has been added for a new data source: Cockroach DB.
  1. Import & Export Dashboard API:
    API support has been added for exporting and importing dashboards.
  2. Include Metrics in Template Dashboard:
    We have included metrics to the template dashboard for create dashboard embed API.
  3. Create Account using API:
    We have introduced endpoints for creating self-hosted admin accounts and generating JWT tokens, enhancing support for self-hosted instances: Create Admin Account, Create Admin JWT (Self-Hosted), Reset Admin Password (Self-Hosted).

Enhancements:

  1. Table Search Position Options:
    Configurable search positioning has been introduced for table charts and components.
  1. Waterfall Chart:
    Measures can now be treated as difference values by selecting the Difference option in the Waterfall Settings section.
  1. Fullscreen Trigger via Title Click in Embed:
    A new prop: enable-title-click-fullscreen={true}, has been added to enable fullscreen mode when clicking the chart title.

Fixes:

  1. Waterfall Chart:
    Issues with chart labels have been resolved.
  2. ExpiryTime Type in Guest Token Creation & Rotate Token API:
    Handling of the expiryTime parameter in guestToken and guestTokenV2 functions has been improved to ensure consistent data types.
  3. Invite User & Resend Mail Flow:
    Issues in the invite user and resend mail flow have been resolved.
Image Version: 1.2.4
Plugin Version: 0.16.28
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Timezone in Query Execution from Guest Token Parameters:
    We have implemented a feature to set timezone in query execution using guest token parameters.
  2. Added BYOD Support for CockroachDB:
    Added BYOD support for CockroachDB (connect your own Cockroach instance).
  3. AI Suggestions for SQL Editor:
    Connect your LLM to enable AI-powered suggestions for table names, schema names, and column names.
  1. Validation of Allowed Embeds in Guest Token Creation:
    We have added a feature to validate allowed embeds during the process of guest token creation.

Enhancements:

  1. Subtotals at All Hierarchy Levels in Pivot Table V3 Chart:
    Enable the “Show for all Levels” toggle to display subtotals across all hierarchy levels.
  1. Individual Column Formatting for Table Charts:
    We have added support for formatting columns individually in Table, Horizontal Table, Pivot V2 & V3 charts. (Image 2)
  1. Raw Values as Chart Labels in Waterfall Charts (V1 & V2):
    Turn on the “Show Actual Value Label” toggle to view raw values in chart labels instead of increase or decrease. (Image 3)
  1. Customizable Total Column in Waterfall Chart V2:
    We have added support to customize the name of the “Total” column in Waterfall Chart V2. (Image 4)

Fixes:

  1. Dashboard Row Limit Persistence:
    Resolved an issue where settings for limit and rows per page were not retained in the dashboard.
  2. Improved LLM Settings Behavior:
    Model dropdown is enabled only after API key validation, model selection is enforced post-validation, the first validated LLM is auto-set as default, and redundant UI status messages have been removed.
Image Version: 1.2.3
Plugin Version: 0.16.23
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Improved Join Handling in End-User Metric Creation:
    Updated the join logic to apply joins only between selected tables and disabled column selection from tables that are not directly connected, reducing invalid joins and improving metric accuracy.
    For example, when a One-to-Many relationship is defined between Orders and Shipments, dragging a column from Shipments will surface only the Shipments and Orders tables for selection. (Gif 1)
  1. Revert Option to Default Date in Metric and Dashboard Filters:
    Users can now switch back to the default date in both metric-level and dashboard-level filters.

Enhancements:

  1. Settings Button Enhancement in Embed:
    Added settings-icon prop to the dbn-dashboard component. settings-icon={JSON.stringify({name: 'random',iconSvg: 'svg'})}
  2. PDF Table Header Wrapping:
    Enabled text wrapping for table headers when downloading dashboards as PDFs.
  3. UI Styling Support for Pivot Table V3 Chart:
    Added UI styling options to the Pivot Table V3 chart.
  1. Dynamic Label Positioning for Waterfall Charts:
    Labels now dynamically adjust their position based on increases or decreases in values.
  1. Cumulative Start and End Labels for Waterfall Charts:
    Added support for displaying cumulative start and cumulative end (running total) labels, making it easier to understand how individual increases or decreases impact the overall total. (Image 5)
  1. Font Size Customization for Tables and Underlying Data:
    Users can now control font sizes via Chart Settings for UI-styled table charts, and via Theme Settings for table charts and underlying data views (popup and fullscreen), ensuring improved readability and visual consistency. (Images 6, 7)
  1. Encryption, Headers, and Documentation:
    Updated filter encryption to use Company ID and added x-authorization header support for proxy authentication keys.

Fixes:

  1. Fullscreen and Download Metric Options in Embed:
    Fixed an issue where Fullscreen and Download options were not visible in embedded dashboards containing merged metrics.
Image Version: 1.2.0
Plugin Version: 0.16.18
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Create Datamart API – Hide Table: Added support for tableList.isHide to hide entire tables from the Datamart interface. Refer to the Create Datamart API documentation for details.
  2. Create Datamart API – Hide Table Column List: Added support for tableList.columns.isHide to hide specific columns from the Datamart interface. Learn more in the Create Datamart API documentation.
  3. CRUD APIs for Datasource: Introduced full CRUD API support for managing datasources. See the Datasource API documentation.
  4. Pie Chart – Measure Breakdown: Added measure-based breakdown for Pie Charts, where wedges are generated based on the number of measures.
  1. Waterfall Chart V2: Introduced Waterfall Chart V2 with cumulative value support.
  1. Multiple Scheduled Reports: Enabled end users to create and manage multiple scheduled reports.
  2. API for Listing User-Created Reports: Added API support to list user-created scheduled reports by embed. Refer to the List Schedule Reports API documentation.
  3. Embed Renaming API: Added API support to assign and update embed names. See the Rename Embed API documentation.

Enhancements:

  1. Dashboard Embed Metadata API: Added new parameters to fetch additional embed metadata, including createdAt, updatedAt, externalMetricId, dataAppId, embedId, and name. Learn more in the List Embed API documentation.
  2. Whitelist Domain Support: Added wildcard support and improved Top-Level Domain handling for whitelisted domains.

Fixes:

  1. Whitelist Domain Validation: Fixed issues related to incorrect Top-Level Domain handling in whitelisted domains.
Image Version: 1.1.140
Plugin Version: 0.16.16
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Service Tokens and API Key Rotation: You can now create and manage service tokens within the app for improved security and API lifecycle management. This enables API key rotation directly through the Data App for safer long-term usage.
  2. Dashboard Deletion via Embed Config: Added support for dashboard deletion using the URL parameter:"isDeleteDashboard": true

Enhancements:

  1. CSV and XLSX Support in Scheduled Reports: Users can now schedule reports in CSV and Excel (.xlsx) formats, expanding export flexibility in automated schedules.

Fixes:

  1. Resolved Metric Loading Issue: Fixed an issue where loading a metric caused the entire dashboard to load instead of only the selected metric.
  2. Dashboard Filters on Empty Dashboards: Filters are now supported even on dashboards with no visualizations.
  3. Schedule Report in Embed: Scheduling reports through embedded dashboards now works contextually based on the selected dashboard and client.
Image Version: 1.1.139
Plugin Version: 0.16.14
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Auto Joins in End-User Metric: You can now set up auto joins in the Semantic layer. End users can drag and drop to create metrics from different tables seamlessly.
  2. Publish Metric API: Added support to publish all metrics via API using the property isPublished: true.
  3. Update Datamart API: Added support to update datamarts via API.
  4. Workspace APIs: Added APIs for Create Workspace, Update Workspace, and List Workspaces.

Enhancements:

  1. LLM Model Selection in Settings: You can now choose and configure your preferred LLM model (e.g., gemini-2.5-flash, gemini-2.5-pro-preview, etc.) directly in the LLM settings.
  2. Custom Field Support in End-User Metric Creation: Added support for custom fields during end-user metric creation.
  3. Embed Axis Color Properties: Chart axis colors can now be customized using:

Fixes:

  1. Filter Dropdown in Metric Creation Page: Resolved issues with simple filter dropdown values.
  2. Bar Length: Fixed an issue where bar lengths were not consistent.
  3. Optimized Embedded Dashboards for Mobile/Tablet: Improved layout consistency for smaller screens, including better handling of Dashboard Filters, Filter Popups, and View Boards.
  4. Encryption in End-User Metric Creation: Enabled encryption during end-user metric creation.
  5. Filter Value in MSSQL: Resolved the “Metric already exists” error during end-user metric creation.
Image Version: 1.1.137
Plugin Version: 0.16.12
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Gemini LLM: Added a new connector for LLMs — Gemini.
  1. User Defined Fields (UDF): Easily customize dashboards with your own data fields — no schema changes needed. DataBrain now auto-detects and supports both common and client-specific fields as dynamic filters and chart axes for flexible, personalized insights.

Enhancements:

  1. Filter Elements for Fetch Metrics API: Added a new parameter isMetric=true in the API to filter metric-level responses.
  2. Prop for Download Dashboard as PDF: Added a new embed prop enable-download-all-pdf={true} to allow exporting dashboards as PDF files.
  3. Naming Conventions & Methods in End User APIs: Updated HTTP methods to include POST, GET, PUT, and DELETE.

Fixes:

  1. Trino: Resolved a server error when creating a metric due to “Zero-length delimited identifier not allowed”.
  2. Logs in Playground: Implemented a logging mechanism in the playground environment.
  3. Chat Mode: Fixed query-related and limit issues in chat mode.
  4. Metric Cards: Removed extra spacing in Metric Cards and Full-Screen View.
  5. Invite User Settings: Added validation for user invites.
  6. Alias Modification: Fixed issues related to alias name updates.
Image Version: 1.1.136
Plugin Version: 0.16.8
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. API Endpoint for End User Dashboard Creation: End users can now create dashboards directly through the API.
  2. New Data Source – Trino: Added support for a new data source — Trino.
  1. Single-Click Download for Metrics Data in Embed: End users can now download the underlying data for all metrics with one click by adding the prop:
    enable-download-csv="true"
  2. Fullscreen Metrics in Embed: Metrics can now fit fullscreen in embeds using the prop:
    shouldFitFullScreen="true"
  3. Private & Publish End User Metric in Embed Dashboard: You can now use userIdentifier inside the params object to uniquely identify end users in embedded dashboards.

Enhancements:

  1. Customizable Fonts for Table Chart: Added options to configure font family, font color, and font weight in table charts.
  1. UI Theming for Underlying Data: Introduced settings to customize header text, background color, content text, spacing, and font weight for underlying data.
  1. Support for Label and Hide Options in Datamart & Create Metric: You can now add labels to columns and hide columns on the create metric page by configuring them in the Datamart layer.
  1. Enhance Gantt Chart: You can now add additional dimensions to the tooltip of Gantt charts.
  1. Variable Value Support for Next Preset Date Filter: Added variable value support for the “Next” preset date option in metric and dashboard filters.

Fixes:

  1. Percentile Continuous and Percentile Discrete: Resolved issues with the Partition By and Value fields in the Percentile function.
  2. End User Metric Creation: Fixed the loader issue in chart view and problems related to the distinct option in dimensions.
  3. Unpublished Metrics: Resolved issues affecting metric listing and deletion.
Image Version : 1.1.134
Plugin Version : 0.16.2
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Boards: Users can now create multiple views of a dashboard based on applied dashboard filters and easily switch between them.

Boards.mp4

Enhancements:

  1. Set Default Client Per Dashboard: Users can set a default client for each dashboard.
  1. Edit Metric: Users can edit a metric by clicking the edit icon next to the metric name.
  1. Lifetime Option in Single Value Card: A new option, Lifetime, has been added to Single Value Cards to perform aggregate calculations without comparisons.
  1. Customize Dashboard Layout in UI Theming: Users can now configure vertical and horizontal gaps for dashboard layouts in the UI Theming page.
  1. Height-Based Auto Pagination in Table Charts: Table charts now support automatic pagination based on height, adjusting the number of rows dynamically.
  1. Prop for Breadcrumb (Drill Down) Color and Font Family: Users can now add color and font family to breadcrumbs when drill down is enabled in embed.
  2. Prop to Change Badge Color of Multi-Select Filter: Introduced a property for pill color in the multi-select badges in embed.

Fixes:

  1. Updated Results Table for No Data: The image displayed when a query returns no results in the Query Builder has been updated.
  2. Drill-Down Issue with Unselected Dimensions: Fixed an issue where an unselected dimension appeared in the drill-down hierarchy.
  3. Date Filter Font Consistency: Fixed font inconsistencies in date-based metric filters.
Image Version : 1.1.131
**Plugin Version **: 0.15.150
DataBrain Updates: Enhancements, Fixes

Enhancements:

  1. ‘percentile_cont’ and ‘percentile_disc’ Functions for Measures: You can now calculate continuous and discrete percentiles using these new functions.
  1. Download Dashboard as PDF: Users can now download dashboards in PDF format.
  1. Dropdown Multi-select Filter for String Columns in Table Chart: A dropdown multi-select filter can now be added to any string column in a table chart.
  1. Trendline Support: We have introduced trendline functionality in table charts using custom SQL.

Fixes:

  1. Default option for LLMs: You can now set any LLM as the default option.
  2. Metric Filter Styling Issue: Fixed font and font size inconsistencies in date-type metric filters.
  3. Underlying Data Download in OpenSearch: Resolved issues related to downloading underlying data in OpenSearch.
**Image Version **: 1.1.129
**Plugin Version **: 0.15.143
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. API Endpoint for Datamart: Users can now perform CRUD operations on datamarts using the API endpoint.
  2. Hybrid (Stacked + Bar) Chart: A new chart type, Hybrid Bar, has been introduced.

Enhancements:

  1. Metric Filter Interaction: Improved workflow for switching between ‘Apply On’ and ‘Filter Options’ in Metric Filters for smoother navigation.
  2. Gantt Chart Styling: Added bar styling options for Gantt Chart, including Bar Height, Top Radius, and Bottom Radius.

Fixes:

  1. Scheduled Report Issues: Resolved the “No Data Found” and layout issues in scheduled reports.
  2. Gantt Chart: Fixed date format issues in the Gantt chart.
  3. Hide App Filter in Filter Box: The App Filter is now hidden in the dashboard switch select filter to enhance security and ensure proper functionality.
Image Version
: 1.1.122
, Plugin Version
: 0.15.136
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Gantt Chart: Introducing the Gantt Chart for enhanced timeline-based visualization of tasks and projects.
  1. Y Axis - Log Scale: Added the ability to convert the Y-axis to a logarithmic scale for improved visualization of wide-ranging values.
  1. Click Action on Single Value Card: Enable interactive experiences by configuring click actions on Single Value Cards.
  1. New Data Source - OpenSearch: Now supporting OpenSearch as a data source, expanding your integration options.
  1. Optional Variable Filters: Variable filters can now be made optional using square brackets in code blocks for greater flexibility.

Optional Variable Filter.mp4

Enhancements:

  1. Underlying Data Download: Added support to download filtered underlying data for deeper offline analysis.
  1. Badge Color in Table Chart: Introduced the ability to set badge colors in table chart conditional formatting.

Fixes:

  1. Switch Select Default Value: Resolved inconsistencies in Switch Select options by setting a default value.
  2. Dynamic Properties in Descriptive Elements: Fixed loading issues in dynamic properties across footnote, title, description, and long description.
  3. Athena Load Time Disparity: Addressed inconsistencies in load time between Query Editor and Chart Builder for Athena data source.
Image Version
: 1.1.119
, Plugin Version
: 0.15.130
DataBrain Updates: Enhancements, Fixes

Enhancements:

  1. Drill Down Revamp: We’ve updated the UI of Drill Down Feature to ensure better clarity and visibility.

Drill Down_Revamp.mp4

  1. Custom SQL Revamp: We’ve enhanced the Custom SQL interface to offer a cleaner editing experience and improved validation feedback for better query building. Users can write custom SQL queries and save them as Table Chart, Table Chart with Dynamic Table, New Chart or Custom Dataset.

SQL Rvamp 2.0.mp4

  1. Single Value Card: We’ve added alignment and font options, along with dynamic property support for sub-header text in the Single Value Card. String-based conditional formatting support has also been introduced.
  1. Metric Border Color: Users can now specify the metric border color globally from the UI Theming page.

Fixes:

  1. Filter Disappearance on Sync in Metric Page: Resolved an issue with the variable metric filter for the Redshift data source.
  2. Custom Columns in Simple Filter: Fixed an issue where custom columns were not appearing in the simple filter.
Image Version
: 1.1.116
, Plugin Version
: 0.15.127
DataBrain Updates: Enhancements, Fixes

Enhancements:

  1. Background Color Option for Metric Summary: You can now set a background color for the metric summary card.
  1. Delete Option for Custom Roles: A delete option is now available for custom roles.
  1. Chart settings for chart title, axis labels, axis values, and legend have been added globally under the ‘UI Theming’ section on the Embed Settings page.

Fixes:

  1. Download data issue in Athena data source: Resolved an issue with downloading data in metrics and when limit is applied.
  2. Logo in Scheduled Reports: Resolved an issue with the logo in scheduled reports.
  3. Switch Y Axis Enablement with Individual Number Formatting: When the “Switch Y-Axis” option is enabled, each measure now correctly applies its own number formatting settings.
Image Version
: 1.1.108
, Plugin Version
: 0.15.122
DataBrain Updates: Enhancements, Fixes

Enhancements:

  1. Date Restriction Feature in Preset Date Dashboard Filters: We have added an “Enable Restrictions” toggle to the Preset Date Dashboard filter, similar to the Metric Filter.
  1. OIDC Identity Provider (IDP) Support: Users can now create an OIDC-based IDP for Single Sign-On (SSO) under MFA & SSO Settings

Fixes:

  1. Dashboard UI Fix: Resolved an issue where the ‘Reset’ button overlapped with other UI elements on the dashboard page.
  2. Report Scheduling: Added user prompts for improved clarity and guidance during report scheduling.
Image Version
: 1.1.106
, Plugin Version
: 0.15.120
DataBrain Updates: Features, Enhancements, Fixes

Features:

  1. Add Alignment Option for Single-Value Card: You can now align the value in Single-Value Cards.
    Navigate to Settings > Appearance > Customizations > Alignment for more control over layout.
  1. New Data Source – Athena: We’ve added support for a new data source: Athena
  1. Horizontal Combo Chart: A new chart type has been introduced, similar to the combo multi-scale chart but arranged horizontally.
  1. Bubble Chart V2: The updated version of the Bubble Chart now allows users to specify bubble size. You can now set a measure for bubble size and drag & drop measures into dimensions.

Enhancements:

  1. Date Range Mapping for Single Value Card Comparison: Single value cards now automatically reflect the selected dashboard date filter range. If “Lifetime” is chosen, the card uses the comparison value set in its settings.
  1. Grid Dividers in Merge Metric: Users can now add grid dividers between different metrics and enhance them with background colors.

Fixes:

  1. Download Array Datatype Column Values: Fixed an issue where array-type column values were not downloaded correctly.
  2. Single Value Card Resizing: Resolved inconsistencies in resizing behavior for Single-Value Cards.
  3. Progress V2 Number Formatting: Addressed incorrect number formatting on upper limit when using dynamic properties.
  1. Combo Chart Duplicate Axis: Fixed an issue where duplicate axes appeared in Combo Charts.
  2. Resolved an issue with the preset date dashboard filter in Firebolt.
Image Version
: 1.1.102
, Plugin Version
: 0.15.116
DataBrain Update: Enhancements

Enhancements

  1. Complex Sort in Metrics: Added a feature to generate SQL for custom sorting beyond the default lexicographical ASC and DESC provided by SQL.

Advanced Sort.mp4

  1. Role Permissions for Metric Elements: Introduced an option to manage role-based permissions for metric elements.
  1. “All Clients” Option: Added an “All Clients” selection on the metric creation page.
  1. Transpose Data in Table Charts: Introduced a toggle to switch rows and columns in table charts.

Transpose Data.mp4

Image Version
: 1.1.101
, Plugin Version
: 0.15.113
DataBrain Update: Enhancements & Fixes

Enhancements

  1. Metric Expression Support in Elements: We have introduced metric expression support in elements, allowing users to compute values using metric ID.

Metric Expression.mp4

  1. Added Variable Filter for Preset Date Filter: Implemented a variable filter in the preset date option for dashboards.

Fixes

  1. Improved Pagination on the Explore Data Page: Fixed an issue where pagination did not display correctly, ensuring a smoother navigation experience.
  2. UI Update: Resolved an issue with tooltips for better usability.
Image Version
: 1.1.100
, Plugin Version
: 0.15.111
DataBrain Update: Enhancements & Fixes

Enhancements

  1. Font Style Options in Axis Charts: Added Font Family, Font Size, and Font Weight options for horizontal and vertical axis names
  1. Font Styling for Metric AI Summary: Users can now customize font styles in the Metric AI Summary
  1. Text Wrap in Combo Multi-Scales Chart: Users can now define a value to break text in the Y-axis name of the combo multi-scales chart
  1. Customize Date Format: Users can now set their preferred date format for the date filter in the “UI Theming” page

Fixes

  1. Explore Data: Fixed a download issue in the Explore Data feature
Image Version
: 1.1.99 , Plugin Version
: 0.15.107
DataBrain Update: Enhancements & Fixes

Enhancements

  1. Sorting and Number Formatting for Pivot Table V2: Added options for sorting and number formatting in Pivot Table V2
  1. Custom Value Redirection in Table Chart: Users can now click on a specific value in the Table Chart to be redirected to a designated link

Custom Value Redirection.mp4

Fixes

  1. UI Update: Chart Tooltip settings will remain hidden until the “Label Tooltip” toggle is enabled
  2. Metric Alignment Fix: Resolved an issue where metric alignment changed after exporting and importing a dashboard.
Image Version
: 1.1.98, Plugin Version
: 0.15.104
DataBrain Update: Enhancements & Fixes

Enhancements

  1. Editability of Created Views in Custom Datasets: Exploring the feasibility of enabling editing and deleting capabilities for previously created views within custom datasets.
  1. Enhanced Pivot Table V3.
  1. Improved UI for Table Chart Pagination.
  1. Metric Background Color in Single Value Card: Users can now add a background color to Single Value Cards.
  1. Set Config: User can now set Data Config Options in Embedded Dashboards.

Fixes

  1. Fixed flickering issue in bar charts.
  2. BigQuery Data Source Fixes: Resolved issues with GROUP BY, single quotes in filters, and AI-powered query formatting.
Image Version
: 1.1.96
, Plugin Version
: 0.15.102
DataBrain Update: Features, Enhancements & Fixes

Features

  1. Auto Format Custom SQL with AI: Introduced an AI-powered feature for automatically converting custom SQL queries into DataBrain’s preferred format, ensuring consistency and improved query management.

Enhancements

  1. Multiple Dependencies in Metric Filters: Users can now add multiple dependencies between metric filters for greater flexibility.
  1. Conditional Band Formatting for Horizontal Bar Chart: Allows users to apply custom band colors based on defined ranges, enhancing visual clarity.
  1. Font Weight Dropdown: Added a dropdown to select font weights for text values, enhancing readability and customization.
  2. Improved User Experience in “Manual” Dashboard and Metric Filter: The mandatory fields ‘Option Value’ and ‘Option Label’ now appear by default, eliminating the need to manually click ‘+ Add Option.’
  3. Added Range Option Type in Metric Filter: Enables users to specify a range of values for improved filtering flexibility.
  1. Text Wrapping in Table Chart Columns: Introduced text wrapping for better readability in table charts.
  1. Column Resizing in Table Chart Without Table Header: Users can now resize columns, regardless of whether the table header is hidden.

Fixes

  1. Escape Filter Values with Single Quotes: Metric filters now properly accept values containing single quotes.
Image Version: 1.1.94
Plugin Version: 0.15.99
DataBrain Update: Enhancement

Enhancement

  1. Added options in preview link: Users can now control the side panel and dashboard name in the preview link generation.
Image Version
: 1.1.93
, Plugin Version
: 0.15.98
DataBrain Update: Features, Enhancements & Fixes

Feature

  1. Datasource Sync API: Exposed an API for syncing the datasource

Enhancements

  1. Dashboard Date Filter & Time-Series Chart Integration: We have added support for mapping dashboard date filter options with time-series charts for improved synchronization
  1. Bar Styling for Combo Multi-Scales Chart: Added a “Bar Styling” option to the combo multi-scales chart for better customization. This feature allows users to fine-tune the appearance of bars for improved visualization and readability with key Customization Options:
  • Bar Width – Adjust the width of bars to control spacing and visual clarity
  • Bar Top Radius – Round the top edges of bars for a softer, modern look
  • Bar Bottom Radius – Customize the bottom edge roundness for a polished appearance

Fixes

  1. Bubble Chart in Firebolt: Resolved an issue affecting the Bubble chart when using the Firebolt datasource
  2. UI Update (Fullscreen Dropdown Component): Fixed an inconsistency in dropdown behavior when in fullscreen mode
Image Version
: 1.1.92
, Plugin Version
: 0.15.96
DataBrain Update: Enhancements & Fixes

Enhancements

  1. Horizontal Chart: Added Switch X-Axis and Switch Y-Axis features for improved flexibility
  2. Sankey Chart: Introduced Switch Measure functionality for better customization

Fixes

  1. Resolved an issue where the Switch X-Axis Dropdowns displayed removed dimension values
  2. Fixed duplicate values appearing in the Filter Panel dropdown in Custom Query Mode
Image Version
: 1.1.91
, Plug In version
: 0.15.94
DataBrain Updates: Features, Enhancements, Fixes

Features

  1. Rearrange Metric Filters: You can now rearrange metric filters on the update/create metric page using drag-and-drop, making customization easier and more intuitive.

Metric Filter Reorder.mp4

  1. Save a Custom Dataset (View) to Multi-Selected Datasource: You can now save a custom dataset across multiple selected data sources, enabling seamless data management and greater flexibility. Refer to the document below:
    Creating a custom dataset view
  2. Support Fiscal Year in Date Filter: You can now set up a custom fiscal year filter in DataBrain to filter data based on the Indian Financial Year. Refer to the documentation below:
    Custom Fiscal Year Filter Setup
  3. Easier Access to Frequently Used Tables: Frequently used tables now appear at the top of the schema sidebar on the metric creation page, improving accessibility and efficiency.

Prioritize Frequently Used tables.mp4

Enhancements

  1. Adaptive formatting for Indian decimals: The Indian Number System now considers values up to two decimal places.
  1. Enhanced Chart Controls for End Users: End users can now access additional chart options, including Enable Cumulative Behavior, Dynamic Behavior, and Chart Zoom, for improved data visualization and interaction.

End user Chart settings.mp4

Fixes

  1. UI update: We have enhanced the user experience by eliminating flickering when switching between the Charts Panel and Settings Panel, ensuring a smoother and more seamless transition.
  2. Improved Reset Password Flow: Expired Reset Password links now immediately display a “Reset Password Link Expired” message, preventing unnecessary input.
  3. Date filter: The Date Filter now accepts only four-digit years, preventing incorrect inputs.
Image Version: 1.1.89
Plug In version: 0.15.87
DataBrain Updates: Features, Enhancements, Fixes

Features

  1. Drill Down for Tree Map: Introducing drill-down functionality in Tree Map charts! Click on a section to explore deeper levels of data effortlessly.

Tree Map.mp4

  1. Chart Click Action with Metric: Now, clicking on a metric within a chart allows seamless navigation to another related metric for enhanced data exploration.

click action.mp4

  1. Add View Button in Table Chart: Added a “View” button in table charts, enabling users to expand selected columns within a row for better data visibility.

Table hide column.mp4

  1. Add RHS Custom SQL Support: Added the ability to control how selected options from a dashboard dropdown are applied on the RHS of the WHERE clause. Use the {{global_selected_values}} variable to modify selected values dynamically (e.g., applying transformations like CONCAT).
  1. End users can now archive metrics

Enhancements

  1. Adaptive Formatting – Indian Number System: Added support for number formatting in the Indian system (e.g., lakh, crore) for improved readability.
  1. Copy Generated SQL with One Click: A new “Copy” button allows you to easily copy the generated SQL query.
  1. Customizable Color Palettes: Modify colors in existing palettes anytime to match your theme by clicking on the edit icon.

Fixes

  1. Side Panel UI: Addressed display inconsistencies in the join panel, resolving issues with overflowing fields for a cleaner user experience.
  2. Time-Series Chart: Resolved an issue where the chart headers were not displaying correctly in metric full-screen mode.
  3. Workspace Panel: Fixed scrolling issues for a smoother and more seamless user experience.
  4. Combo Option in Time-Series Chart: Resolved an error that occurred when using the combo option in the time-series chart.
Image Version: 1.1.86
Plugin Version: 0.15.82
Features, Enhancements, Fixes:

Features:

  1. Footnote as a Rich Text Box: Footnotes are now powered by a React text box, allowing you to add links, change colors, and apply formatting like bold and italics for better customization.
  1. Hide Dashboard Filter in Embed Code: You can now control the visibility of dashboard filters in embedded dashboards. This is useful for cases where different user groups need different filter options. For example, US customers can see the US fiscal year, while Indian customers see the Indian fiscal year—without displaying unnecessary filters. Please refer the below link:
Options
The extra options/parameters that you can pass for your Web Component.
  1. Cumulative Option for Line and Area Charts: A new “Cumulative” option has been added to Line and Area charts, accessible under Chart Settings > Appearance > Features > Cumulative for better trend analysis.
  1. SDK Overrides: Now you can override card titles, descriptions, footnotes, column names (for tables), and label/legend names (for charts) directly in the SDK for enhanced customization. Please refer the below link:
Options
The extra options/parameters that you can pass for your Web Component.
  1. New Progress Bar Chart and Geo Region Map: Added two new charts, Improved Progress Bar and Geo Region Map for Indian States.

Limits (1).mp4

India map (1).mp4

  1. Merge Layouts: Easily merge multiple metrics and rearrange them with the same flexibility as the dashboard’s custom layout.

Merge sections (1).mp4

  1. Preview Link Management: Track all preview links generated for dashboards and delete those no longer needed for better link management.

Preview Links (1).mp4

Enhancements:

  1. UI Theming Update: You now have the option to remove the stroke around metric cards for a cleaner visual experience.
  2. Revamped Chart Panel in Create Metric Page: Charts are now grouped under categories, making it easier to find and search for the desired visualizations.
  3. Dynamic Property Support: Added support for dynamic property implementation in the lower and upper limit setup.
  4. Clear All Option: Easily clear all columns added in measures or dimensions with a single click using the “Clear All” functionality.
Image Version: 1.1.77
Plugin Version: 0.15.65
Features, Enhancements, Fixes:

Enhancements:

  1. Donut Chart: Added the ability to switch X and Y axes for enhanced customization.
  1. Dynamic Property Support: Metrics created using Python now support dynamic properties for greater flexibility.
  2. Box Plot: Enhanced Box Plot to support multiple experiments, enabling richer comparative analysis.

Fixes:

  1. Radial Charts: Fixed the legend scrolling issue for a smoother user experience.
DataBrain Update: Features, Enhancements & Fixes

Features

  1. Auto Format Custom SQL with AI: Introduced an AI-powered feature for automatically converting custom SQL queries into DataBrain’s preferred format, ensuring consistency and improved query management.

Enhancements

  1. Multiple Dependencies in Metric Filters: Users can now add multiple dependencies between metric filters for greater flexibility.
  1. Conditional Band Formatting for Horizontal Bar Chart: Allows users to apply custom band colors based on defined ranges, enhancing visual clarity.
  1. Font Weight Dropdown: Added a dropdown to select font weights for text values, enhancing readability and customization.
  2. Improved User Experience in “Manual” Dashboard and Metric Filter: The mandatory fields ‘Option Value’ and ‘Option Label’ now appear by default, eliminating the need to manually click ‘+ Add Option.’
  3. Added Range Option Type in Metric Filter: Enables users to specify a range of values for improved filtering flexibility.
  1. Text Wrapping in Table Chart Columns: Introduced text wrapping for better readability in table charts.
  1. Column Resizing in Table Chart Without Table Header: Users can now resize columns, regardless of whether the table header is hidden.

Fixes

  1. Escape Filter Values with Single Quotes: Metric filters now properly accept values containing single quotes.
DataBrain Update: Enhancement

Enhancement

  1. Added options in preview link: Users can now control the side panel and dashboard name in the preview link generation